Client
                        
                        
                        PT. Sumbawa Jutaraya (SJR)
                        
                        
Category
                        Mining & Mineral Processing
                        
                        
Location
                        
                        
                        Sumbawa Island, Sumbawa Besar, Sumbawa Capital
District, Indonesia 
                        
Year of Completion
                        2019
                      
 PT.
Sumbawa Jutaraya (SJR) was proposing to develop the Pangulir Gold Project which
was classified into oxidation domains of Oxide and Sulphide. About 25 % of
deposit was to be distributed as oxide and 75% as sulphide ore. The Pangulir
gold processing plant planned to consist of Comminution, Gravity (centrifugal
concentration) and cyanide leach with carbon adsorption (CIL) Circuit.
Additional pretreatment circuit was prepared to anticipate the refractoriness
of Sulphide ore which can only recover < 80% Au. The pretreatment circuit
consists of Flotation and Roasting circuit.
BMS/CES
was engaged by PT. Sumbawa Jutaraya (SJR) to provide engineering services and
associated deliverables for Basic Engineering Design (BED) to Feasibility Study
level associated with Pangulir Gold Project Process Plant    
                        
                        SCOPE