BMS has been engaged by Merdeka Tsingshan Indonesia (MTI) for the supply and installation of Electrical and Instrumentation works for the associated with the Acid, Iron, Metal (AIM) Processing Plant facilities located in the Indonesia Morowali Industrial Park (IMIP).
VIEW moreBMS has been engaged by PT Batutua Tembaga Raya (BTR) for the design, supply and installation of Electrical, Instrumentation and Control System works for the new Partolang Pit Leach Pad (PPLP) at its Wetar Island operations.
VIEW moreBMS was engaged by PT Bumi Suksesindo (BSI) to provide engineering services for the integration of new control system hardware and software into the existing Tujuh Bukit ADR Control System.
VIEW more
BMS
/CES was engaged by Far East Gold to complete conceptual study producing a +/-30%
capital and operating cost estimate for the project to be used for project
evaluation and to update a previous Government Feasibility Study.
BMS was engaged by PT Batutua Tembaga Raya (BTR) for the design, supply and
installation of Electrical, Instrumentation and Control System works for the upgrade
of its existing Neutralization plant at its Wetar Island operations.
BMS was engaged by PT Batutua Tembaga Raya (BTR) for the complete Electrical, Instrument and Control System design, supply, installation and commissioning of a barge loadout conveyor system. The facility consisting of dump hoppers, vibrating feeders, conveyor and telescopic chute is used for loading Pyrite Ore onto barges.
VIEW more
BMS was engaged by PT Bumi Suksesindo (BSI) for the design, supply
and installation of Electrical, Instrumentation and Control System works for a
second Elution Circuit.
BMS/CES
was engaged by PT Adaro Maruwai Coal (AMC) to complete the multidiscipline
detail design of the Lampunut Coal Wash Plant Operations infrastructure and
utilities.
BMS/CES
was engaged by PT. Sumbawa Jutaraya (SJR) to provide engineering services and
associated deliverables for Basic Engineering Design (BED) to Feasibility Study
level associated with Pangulir Gold Project Process Plant
BMS was engaged by PT Bumi Suksesindo (BSI) for the design,
supply and installation of Electrical, Instrumentation and Control System works
for ADR process plant expansion including a second Carbon in Column (CIC)
train, new scavenger circuit, detox clarifier, detox filter, heap leach
reticulation booster station and associated support infrastructure.
BMS was engaged by Merdeka Copper Gold (MCG) to complete
power system modelling using ETPA power station and complete power system
studies with reports outlining results and recommendations.
BMS was engaged by
PT
Bukit Makmur Mandiri Utama (BUMA
) for the electrical, instrumentation and
control system installation works for the Wara Crushing Plant project.
BMS/CES
was engaged PT Adaro Met Coal (AMC) to provide multidiscipline detail design of
the Muara Tuhup Port Upgrade.
BMS/CES was engaged by Battery Limits Australia to complete the multidiscipline study
level design and capital cost estimate for the Bunyu Graphite Project located
in Tanzania, Africa.
BMS
/CES was engaged Battery Limits Australia to complete the multidiscipline study
level design and capital cost estimate for the Minerals Commodities LTD (MRC)
Munglinup Graphite Project in South West Western Australia.
BMS/CES
, was engaged by Able Return SDN.BHD Malaysia a
division of Monument Mining, to complete the multidiscipline Front End
Engineering Design (FEED) associated with existing plant and facilities
upgrades to be able to accept Sulphide ores 0.95 Mtpa
BMS/CES was employed by Wafi-Golpu Joint Venture to provide multidiscipline engineering
services and associated deliverables to Feasibility Study level for the
Concentrate Export Facility located at the Port of Lae
BMS was engaged by
PT Bumi Suksesindo (BSI) for the supply and
installation of Electrical, Instrumentation and Control System works for the Tujuh
Bukit OPP Project.
BMS was engaged by PT Bumi Suksesindo (BSI) for the supply and installation of
Electrical, Instrumentation and Control System works for ADR process plant and
associated support infrastructure.
BMS
,
was engaged by PT Adaro Indonesia (AI) to complete the engineering, procurement
and construction associated with the Kelanis Hopper #2 Improvement Project.
BMS
/CES was engaged
PT Gemala Borneo Utama (GBU) to complete the
multidiscipline Definitive Feasibility Study for the Romang Gold & Silver
project.
BMS was engaged by Mawson West Australia to complete the Electrical
Instrumentation and Control System procurement and construction associated with
the Kapulo Copper Project.
BMS/CES was employed by Mawson West Australia to
complete the multidiscipline detailed design for the Kapluo Copper Project. The
works included the Control System Development using Allen Bradley Control Logix
and Citect SCADA.
BMS, was engaged by
FCF Minerals to provide
ongoing engineering support for the installation and commissioning of the site
wide control system using Allen Bradley Control Logix and Citect SCADA
BMS
/CES was engaged by FCF
minerals to complete the multidiscipline detailed design for the Runruno Gold
Project. The works included the Control System Development using Allen Bradley
Control Logix and Citect SCADA.
BMS
,
was engaged by
Sumatra Copper and Gold (SCG) to complete the
Electrical Instrumentation and Control System procurement and construction
associated with the Tembang Gold Project.
BMS/CES was engaged by Sumatra Copper and Gold to complete the multidiscipline detailed
design for the Tembang Gold Project. The works included the Control System
Development using Allen Bradley Control Logix and Citect SCADA.
BMS was engaged by
PT Kasongan Bumi Kencana
(KBK) to complete the Electrical Instrumentation and Control System procurement
and construction associated with the Mirah Gold Project.
BMS was engaged by PT Kasongan
Bumi Kencana (KBK) to design and develop the Mirah Gold Project Control System
using Allen Bradley Control Logix and Citect SCADA.
BMS was engaged by Roberts and
Schaefer as their E&I Sub-Contractor to complete the engineering,
procurement and construction (EPC) for Electrical, Instrumentation and Control
System works associated with the Kaltim Prima Coal (KPC) 13km OLC and Tanjung
Bara Port Stockyard Duplication Project. The works included the Control System
Development using Siemens S7300 and WinCC SCADA.