AIM Project

BMS has been engaged by Merdeka Tsingshan Indonesia (MTI) for the supply and installation of Electrical and Instrumentation works for the associated with the Acid, Iron, Metal (AIM) Processing Plant facilities located in the Indonesia Morowali Industrial Park (IMIP).                

VIEW more

Wetar Partolang Pit Heap Leach Project

BMS has been engaged by PT Batutua Tembaga Raya (BTR) for the design, supply and installation of Electrical, Instrumentation and Control System works for the new Partolang Pit Leach Pad (PPLP) at its Wetar Island operations.                 

VIEW more

Tujuh Bukit Detox Upgrade Control System

BMS was engaged by PT Bumi Suksesindo (BSI) to provide engineering services for the integration of new control system hardware and software into the existing Tujuh Bukit ADR Control System.                    

VIEW more

Wonogiri Gold Project

BMS /CES was engaged by Far East Gold to complete conceptual study producing a +/-30% capital and operating cost estimate for the project to be used for project evaluation and to update a previous Government Feasibility Study.

                    

VIEW more

Wetar Neutralization Plant Upgrade

BMS was engaged by PT Batutua Tembaga Raya (BTR) for the design, supply and installation of Electrical, Instrumentation and Control System works for the upgrade of its existing Neutralization plant at its Wetar Island operations. 

            

VIEW more

Wetar Barge Jetty

BMS was engaged by PT Batutua Tembaga Raya (BTR) for the complete Electrical, Instrument and Control System design, supply, installation and commissioning of a barge loadout conveyor system. The facility consisting of dump hoppers, vibrating feeders, conveyor and telescopic chute is used for loading Pyrite Ore onto barges.   

VIEW more

Tujuh Bukit Elution Duplication

PT Bumi Suksesindo (BSI)
Banyuwangi, East Java - Indonesia
2019 - 2020
BMS was engaged by PT Bumi Suksesindo (BSI) to complete the design, procurement and installation of Electrical, Instrument and Control System works associated with the duplication of the ADR Plant Elution Circuit.
The plant is located in Indonesia, specifically Banyuwangi Kabupaten in the province of East Java and consists of a heap leach pad and processing facility to produce gold and silver.​                   

Client                 :
Site location    :
Contract year  :
Scope of work :

Tujuh Bukit SCADA Upgrade

PT Bumi Suksesindo (BSI)
Banyuwangi, East Java - Indonesia
2019 - 2020

BMS was engaged by PT Bumi Suksesindo (BSI) to complete ​complete the Heap Leach and ADR Processing Plant SCADA Upgrade. The Control System consists of Allen Bradley Control Logix PLC Platform and Factory Talk View SCADA Servers and Clients. 

Client                 :
Site location    :
Contract year  :
Scope of work :

Adaro OPCC Dismantle

PT Jasa Power Indonesia (JPI)
Central Kalimantan - Indonesia
2019 - 2020

BMS was engaged by PT Jasa Power Indonesia (JPI) to dismantle, catalogue and preserve the Electrical Installation for an unused portion of the Overburden Out of Pit Crushing and Conveying system.
The dismantle works consisted of 70kV Switchyards and Substations, 20kV Switchyards and Substations and Overland Conveyors.                   

Client                 :
Site location    :
Contract year  :
Scope of work :